伟德国际官网

中文
伟德国际官网东方承建的吉林省长春市农安生涯垃圾点火发电项目烟气净化工程开工建设
2023.11.29
我公司承建的吉林省长春市农安生涯垃圾点火发电项目烟气净化工程于2021年09月28日开工建设。。
The flue gas cleaning project of the Nong'an domestic waste incineration power generation project in Changchun City, Jilin Province, undertaken by our company, started construction on September 18, 2021.
伟德国际(victor1946)官方网站-Officials Website
该项目总设计规模日点火处置生涯垃圾1600吨/日,,,分二期建设,,,一期设计处置规模800吨/日,,,配置2台400t/d炉排型垃圾点火炉,,,年处置规模29.2万吨,,,二期项目处置规模800吨/日。。烟气处置选取“半干法(旋转喷雾反映塔)+干法(喷射氢氧化钙)+活性炭喷射+布袋除尘器+飞灰输送”的烟气净化工艺,,,为我司EPC工程。。
The project has a total designed daily incineration capacity of 1,600 tons of domestic waste per day. It will be constructed in two phases. The first phase has a designed processing capacity of 800 tons per day. It is equipped with two 400t/d grate-type waste incinerators and has an annual processing capacity of 292,000 tons. The processing capacity of the second phase project is 800 tons/day. The flue gas treatment adopts the flue gas cleaning process of "semi-dry method (rotating spray reaction tower) + dry method (injection of calcium hydroxide) + activated carbon injection + bag dust collector + fly ash transportation", which is our EPC project.
伟德国际(victor1946)官方网站-Officials Website
伟德国际官网东方在吉林省的业绩涵盖蕴含:::吉林 、、吉林舒兰 、、通化梅河口 、、长春农安 、、长春德惠 、、长春一期 、、二期 、、三期 、、松原等多个项目。。
Jiangsu Huaxing East’s performance in Jilin Province includes multiple projects such as Jilin, Jilin Shulan, Tonghua Meihekou, Changchun Nong'an, Dehui, Changchun Changchun phase I, II, and III, Songyuan, etc.
伟德国际(victor1946)官方网站-Officials Website
伟德国际(victor1946)官方网站-Officials Website
伟德国际(victor1946)官方网站-Officials Website
更多内容请点击或扫描下方!!!
关注我们!!!
Click or scan below for more information!

Follow us!

伟德国际(victor1946)官方网站-Officials Website

【网站地图】