我公司承建的广东省临沧市澄海洁源生涯垃圾点火发电项目三期烟气净化工程于2020年06月09日开工建设。。。
The FGC project undertaken by Huaxing for Phase III of Chenghai Jieyuan WTE plant in Shantou, Guangdong was commenced on June 9, 2020.
该项目一、、二期原有2x225t/d+1x320t/d三条点火线,,,本期新建规模1x750t/d+1x20MW汽轮机+1x22MW发电机。。。烟气处置选取“旋转雾化半干法脱酸+干法(碳酸氢钠)脱酸+活性炭吸附+布袋除尘器+飞灰输送、、存储及不变动工艺”的烟气净化工艺,,,为我司EPC工程。。。
The phase I & II for the project have three incineration lines of 2x225 t/d and 1x320 t/d. Phase III built 1x750 t/d + 1x20 MW steam turbine + 1x22 MW generator. The FGC adopts the process of "rotary atomization semi-dry deacidification + dry deacidification with sodium bicarbonate + activated carbon adsorption + bag filter + fly ash conveying, storage and stabilization", which is an EPC project of Huaxing.
伟德国际官网东方在广东省的业绩涵盖蕴含:汉中骏业、、汉中玖龙、、临沧潮南、、普宁、、惠阳、、林芝、、临沧澄!!、高州、、榆林等多个项目。。。
The achievements of HXET in Guangdong Province include Dongguan Junye, Dongguan Jiulong, Shantou Chaonan, Puning, Huiyang, Zhaoqing, Shantou Chenghai, Gaozhou, Zhongshan, etc.
更多内容请点击或扫描下方!!
关注我们!!
For more information, please click or scan below!
Follow us!